What is the preferred method of installing wire rope from a reel onto a hoist drum?

  1. The rope runs from the top of the reel to the bottom of the drum

  2. The rope runs from the bottom of the reel to the top of the drum

  3. The rope runs from the top of the reel to the top of the drum

  4. There is no preferred method

The correct answer is: The rope runs from the top of the reel to the top of the drum

Installing wire rope from a reel onto a hoist drum with the rope running from the top of the reel to the top of the drum is essential for ensuring proper winding and functionality. This method allows the wire rope to splice naturally onto the drum, maintaining an optimal alignment and reducing the risk of cross-winding. When the rope is laid out from the top of the reel, it comes off in a manner that facilitates a smooth transition onto the drum, minimizing the chances of kinking or tangling. Such a configuration also helps to ensure that the rope layers build neatly on the hoist drum, promoting even distribution of the load and reducing potential wear over time. Proper installation also contributes to the crane's operational efficiency and safety, avoiding issues like rope binding or uneven spooling that can occur with improper methods.