Question: 1 / 400

What must be done upon completion of crane assembly?

A load test

An inspection to ensure that manufacturer specifications are met

Upon completion of crane assembly, conducting an inspection to ensure that manufacturer specifications are met is crucial for safety and operational integrity. This step verifies that all components have been properly installed and are functioning according to the guidelines set forth by the manufacturer. Meeting these specifications is essential for the safe operation of the crane and to prevent potential accidents or malfunctions during use.

The inspection process typically involves checking critical parts, including the boom, cables, hardware, and any safety devices, to confirm that they are in correct working condition. Identifying and rectifying any discrepancies at this stage helps ensure that the crane will operate safely when it is put to use.

While load tests, certification from external bodies, and reviewing the operator's manual are important aspects of crane operation and maintenance, they are not the immediate actions required right after assembly. These steps may occur separately to validate performance, ensure compliance with regulations, and provide guidance for safe operation, respectively. However, the primary requirement immediately following assembly is to confirm compliance with the manufacturer's specifications through a thorough inspection.

Get further explanation with Examzify DeepDiveBeta

Certification from an external body

A review of the operator's manual